Rogers Greenways & Trails
Master Plan & Website
Select Here 

Welcome to RG&T

 Trails Master Plan

Master Trail Loop

Downtown/Eastern

Blossom Way

NWACC Branch

Heritage Trail

Connections

Area Links
 
 
 
 
 
 

 

Blossom Way
Greenway & Trail

Blossom Way Greenway & Trail is shown on the Master Loop map as Section 12.  It is the first major construction project to be championed by the RG&T Committee. The project extends along Blossom Way Creek, from Dixieland Rd. to 26th St., south of the Rogers High School and north of Laurel Rd. 

The Creek has been restored to a healthy condition via a grant-supported demonstration project, guided by Bob Morgan.  The City has constructed a concrete trail along the stream, and three bridges have been delivered to the site.  They will be installed to complete this section of the master trail loop.
 

Blossom Way Demonstration Project
Map of  Section 12 (Master Trail Loop)
Photo Gallery (see thumbnails of construction scenes below)
 Optimized for Windows and Internet Explorer
  ©2005 Rogers Greenways & Trails Committee

Here are some construction thumbnails of the BWG site south of the High School.
Click each image for full-size photo.
Dixieland CulvertView towards High School from Blossom Way GreenwayRiffles on Blossom Way CreekConfluence of Blossom Way Creek with smaller stream flowing from the east
Development sign on Laurel Rd. with ADEQ storm drainage permit affixedCreekside sign indicating adjacent city parkBlossom Way Creek leaves Creekside areaTrenching for electric lines for Creekside lotsCrew framing trail section
 
 

Quick Link to: Rogers Master Trail Loop

4/22/2005